Sulphuric Acid Plant
Final Absorption Tower/ Intermediate Absorption
Tower/ Drying Tower/ Pump Tanks - 98% H2SO4
at 110°C
Rephonal Lining / Lead Lining with binding
Two Layers Asbestos mill board Lining
Two or more Layers of A.R. Brick Lining in Aroplex
K [SO2 Gases & H2O above
200°C] [For Towers]
Sulphur Furnace
Helozen free silane as membrane
Two layers of Asbestos mill board lining
Two layers of Insulation brick lining with insulation
Mortar
Two layers of Fire Brick Lining with Fire clay [Sulhpur
Above 1200°C]
Sulphur Melting Pit
[Economizer] SO2 Gases above
200°C Sulphur Above 100°C
A.R Brick/Tile lining in Aroplex
K Chimney Stack
A.R. Brick Lining in Potassium based Silicate
cement in Aroplex K
[SO2 Gases above 200°c] Converter
A.R. Brick Lining in Potassium based Silicate
cement Aroplex K and
fire brick lining in fire clay mortar
Floor/ Foundation/Drain/Sump/E.T.P.
A.R. Brick/Tile Lining bedding in Aroplex
K and pointing in Arclor
P over mastic Membrane - Aroprimer
/ Arocompound [Dilute
H2SO4 at room temperature]
Ammonium Sulphate Plant
REACTORS : Carbon Brick Lining in Arfurane
C over a 5mm thick rubber lining membrane -
Arcoy Rubber
Process Floor/ Effluent Tank
A.R. Brick/Tile Lining bedding in Aroplex
K and pointing in Arfurane
R over mastic Membrane - Aroprimer
/ Arocompound
Urea Plant
CONVEYOR : 2 coats of Primer and 10-15mm mastic
membrane with glass cloth
HOPPER : One coat Epoxy Primer, 5mm thick Epoxy
Screeding and One Seal coat.
Bagging Plant / Urea Soils
2 Coats of Epoxy Painting
Tripple Super Phosphate Plant Floor/ Foundation:
A.R. Brick/Tile Lining bedding in Aroplex
K and pointing in Arclor
P over mastic Membrane - Aroprimer
/ Arocompound
ANTI CORROSIVE COATINGS
Structures, Tanks Vessels, Pipelines, Utility
Pipelines, Chimneys, Conveyor Belt & Structures,
Roof/Shades, Utilities etc |